Skip to main content

Sewer Averaging is November 1 - March 15

Oct 1, 2026

Sewer averaging for the 2026–2027 billing year begins November 1, 2026, and continues through March 15, 2027, depending on your billing cycle.

Did you know that your winter water use helps determine your sewer charge for the following year? Sewer averaging for the 2026–2027 billing year begins November 1, 2026, and continues through March 15, 2027, depending on your billing cycle.

During this period, the City averages your water usage readings to determine your monthly average. That average is used to calculate your sewer charge for the next 12 months, beginning April 1.

  • For residents with an average below 12,000 gallons per month, the average monthly usage is multiplied by $5.57 per 1,000 gallons, and that amount is added to the $17.71 base rate.
  • For residents with an average above 12,000 gallons per month, the first 12,000 gallons are charged at $5.57 per 1,000 gallons. Any usage above 12,000 gallons is charged at $13.37 per 1,000 gallons, plus the $17.71 base rate.

How can you lower your sewer average?

Using less water during the winter averaging period can help lower your sewer charge for the following year. Consider these simple ways to conserve water:

  • Fix leaking faucets, toilets and pipes.
  • Take shorter showers.
  • Turn off the water while brushing your teeth.
  • Run your dishwasher and washing machine only when they are full.
  • Avoid unnecessary outdoor watering during the cooler months.
  • Check your water meter for signs of a leak.

Your sewer averaging period depends on your billing cycle:

  • Bills received on the 10th: November 1 through March 1
  • Bills received on the 25th: November 15 through March 15

For more information, call Utility Billing at (210) 619-1100.

Catalogue title


Days Hours
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
#todo masonry has to refresh after clicking photos tab
Article Details

Article Title

Job post

Position

Job Position

Bid details

Status:

Bid Title

Start date
Start:

End date
End:

Apply Now