In order to provide adequate water service to the fast-growing southern Schertz area, it is necessary for the City to construct a one-million gallon elevated storage tank and associated distribution water lines in the Southern Schertz Watershed.The Corbett Elevated Tank Project is located along the future extension of Ray Corbett Drive approximately 1,000 feet beyond where the current road ends. The project was designed by Ford Engineering. The scope of the project includes: construction of the one-million gallon composite elevated storage tank, installation of the new pump station and flow meter, completion of all site work, installation of the access road to the tank site, installation of all electrical controls and instrumentation, installation of associated distribution water mains.  Landmark Structures was selected as the contractor for the project.

Construction Start: March 2019
Construction Completion: Summer 2020
Cost of Construction: $4,682,000.00
Funding Source: Capital Recovery Water and the Water and Sewer Operating Fund

UPDATE - June 2019

  • Earthwork and concrete work continued on the site drainage elements.
  • The tank foundation has been excavated.
  • The tank foundation mud-slab has been poured.
  • Work has begun tying the reinforcing steel for the foundation.
  1. Scott McClelland, E.I.T.

    Project Manager
    Phone: 210-619-1822

elevated-water-storage-tank

Progress Photos

WIN_20190612_11_29_40_Pro
20190613_152848
WIN_20190612_11_20_47_Pro
20190703_105627